Staycation Creation (251) 599-7270 290 Hemlock Dr Fairhope, AL 36532 |
|
ESTIMATE #118
1/16/2026
Sales Rep: Jeremy Ruben
EXPIRES: 6/5/2026 |
|
BILLED TO
Doug Helfrich 103 Marilyn Ave Fairhope, AL 36532
|
JOB ADDRESS
Doug Helfrich 103 Marilyn Ave Fairhope, AL 36532 |
JOB DESCRIPTION
New Pool Construction
| ID | Description | Qty | Extended | Discount |
|
| #1415
|
Pool Quick Quote |
1 |
64,460.00 |
|
|
BASE POOL |
| #1441
|
Base Pool Build: WEEKEND GETAWAY PACKAGE
• Envelope: 15.33' x 27.33' | Area: 291 sq ft | Perimeter: 74 | Depth: 3.5' to 5.5'
• One (1) Standard skimmer | Two (2) Standard VGB main drains | Autofill & Overflow
• Tanning Ledge (with bubbler) and benches priced to design specs.
• Dewater is not included, however, if ground water is present upon excavation, an $1800 dewatering fee will be assessed.
• This proposal does not include shuttle haul of additional dirt. Left-over dirt spoils will be graded away from the pool, leaving a "contractor grade" ready for the installation of sod.
• Staycation Creation can install sod after the decking phase upon request (at an additional cost).
• Start-up, pool school, post-installation plaster care, and a pool maintenance kit are included in this proposal. |
1 |
57,988.00 |
|
|
PERMITTING |
| #1437
|
Permit: All permitting fees included |
1 |
0.00 |
|
| #1436
|
Steel: Standard #3 throughout |
1 |
0.00 |
|
| #1435
|
Gunite: 8" Gunite Shell |
1 |
0.00 |
|
|
RETENTION WALLS |
| #1419
|
Raised Wall: 5' x 1.5' x 1' raised water feature with 1 sheer descent waterfall |
1 |
2,444.00 |
|
| #1417
|
Pool Tile & Coping: • Standard 6" NPT Tile
• Bullnose Concrete Paver Coping |
1 |
0.00 |
|
| #1418
|
Plaster: Blue Quartz Plaster |
1 |
0.00 |
|
| #1422
|
Deck: 537 sq ft 3-piece concrete pavers |
1 |
4,028.00 |
|
|
POOL EQUIPMENT |
| #1420
|
Pool Pump: Hayward TriStar VS 1.85HP with standard 2" suction plumbing |
1 |
0.00 |
|
| #1421
|
Pool Filter: 325 Sq.Ft SwimClear Cartridge |
1 |
0.00 |
|
| #1429
|
Sanitizer: AquaRite S3 Salt System |
1 |
0.00 |
|
| #1432
|
Timer / Automation: OmniLogic® Pool, Spa and Backyard Automation System (water features not included) |
1 |
0.00 |
|
| #1433
|
Plumbing: Standard 2" throughout |
1 |
0.00 |
|
|
ELECTRIC UTILITIES & EXTRAS |
| #1434
|
Electric: 116 total linear feet of electrical run (to equipment pad and pool lights) |
1 |
0.00 |
|
| #1440
|
Pool Extras: - Patio overlay with matching 3-piece concrete pavers - (158 sq ft) - Additional $2,354.00
- Upgrade to Exclusive Retreat package including the Paramount EcoPool Circulation System - Additional $8,698
- Upgrade to Private Oasis package with the Paramount PV# In-floor Cleaning System (Self-Cleaning Pool) - Additional $18,701 |
1 |
0.00 |
|
|
|
Subtotal
|
64,460.00
|
| Tax 0% |
0.00 |
|
Grand Total
|
$64,460.00 |
| PHASE |
COMPLETED |
AMT |
PAID |
DATE PAID |
DUE NOW |
|
Excavation Draw - 40% |
|
25,784.00 |
|
|
|
|
Gunite Draw - 40% |
|
25,784.00 |
|
|
|
|
Deck Draw - 15% |
|
9,669.00 |
|
|
|
|
Plaster Draw - 5% |
|
3,223.00 |
|
|
|
| |
64,460.00 |
0.00 |
DUE NOW: 0.00 |
|
|
Current Job Balance |
$64,460.00 |
I agree to pay the above total according to the card issuer agreement. I also agree to the terms as outlined below.
Sign Your Name Below Using Your Computer Mouse (or using your Finger on a Tablet or Phone):